Installation Method
- The floor panels should be transported in a lying down position. Floor panels should be stored in this position in theirunopened packages in a dry storage location.
- Allow the floor panels to acclimatize (in its unopened packaging) with its surrounding for 48 hours prior to installation.
- Inspect the floor panels before laying. Complaints on materials that have been used will not be entertained. Unused panelsfrom opened packages should be re-sealed in their original packing with adhesive tape.
- The floor panels should be laid as a floating floor system and should not be fixed, in any way, to the sub-floor or to anyvertical structure. Ensure that proper gaps of at least 10mm (3/8 inches) from the walls and any vertical structures aremaintained during installation. These gaps are to be concealed with suitable skirting or expansion profiles after installation.
- Suitable expansion profiles should be used at door threshold and if the length and width of the floor exceeds 12m and 7mrespectively.
- It is recommended that you use felt pads on furniture legs to prevent unintentional scratching on the floor.